How thousands of bottles of mineral water are
produced? How to start a water bottle factory? Well, Sino Holdings Group could
answer those doubts. Actually, SINO is engaged in providing support to those who’d
like to develop their career.
At first, let’s enjoy a exquisite video
about how bottle is molding automatically with filling system and
packaging!
As video shows, you can see that the major processes
could be three parts:
1.
Preform injection molding
Necessary equipment and tool: plastic material, preform injection
mould, injection machine, auxiliary equipment
It’s pretty significant process for whole project, which
requires ensuring the quality of preform with less weight (reduce cost),
because the performs are good or not will decide the following stage’s quality.
2.
Bottle blowing molding
Necessary equipment and tool: preforms, blow mould, bottle
blowing machine
Key process, no matter how outstanding preform is, if there
were something not so good among the blowing machine or tool or technological
parameter, final bottles would fail.
3.
Filling and packaging for final
product
Cleanliness is a healthy element, especially for food and
water. Thus the filling and packaging should ensure the bottle of water safe!
So the water source should keep good, then it should pass washing, filling, tightening
the lid securely (assembling)
Of course that it’s simplified bottle of
water production line, but other details SINO could also offer suggestion and
help you do it as well, that’s total solution, since there are much partners in
China. It will be glad to know you.
Lucy
+8615757605003 (WhatsApp, online service for you)